Home
History
Trail Construction
Trailheads
News/Events
Maps
Internet Links
Trail Work Events
e-mail me




Date:  Saturday January 14, 2012

 

Time:  9:00 AM

 

Meet At:  Location described in “Directions” below

 

Work Location:  Little Pan Segment

 

Activities:  Construct non-motorized trail using accepted trail building techniques and hand tools.

 

This is a physical activity requiring certain health and safety considerations.  Please be aware of your personal physical condition, wear appropriate attire, such as long sleeves and hat if you are sun sensitive, gloves and sturdy footwear.

 

Bring sun screen, your own soft or sports drinks.  We will provide bottled water and lunch.

 

Tools to be used:  Pulaski, McLeod, shovel, pick mattock, limb lopper, and pruning saw.  Tools will be provided, but you are welcome to bring your own if they are marked for easy identification.

 

Directions:  From Interstate 17, either direction; take exit 236 (Table Mesa Rd) toward Table Mesa Trailhead, proceed approximately 1.6 mile to the first “Y” intersection.  Take the right fork and proceed approximately .6 mile to the next “Y” intersection.  Take the left fork and proceed approximately .6 mile further to the parking area.  Directional signs will be posted.  We will carpool from there.  The road to the worksite is a little rough, so high clearance is recommended.


 

January 14, 2012

February 11, 2012

March 10, 2012

April 14, 2012


Other workdays can be scheduled to suit your groups availability.  Please contact bob@bctaz.org.


Attention Mountain Bike Racers

 

Mountain bike racers who need to complete their trail work hours to earn additional MBAA race points can do so by working a minimum of four hours on the Black Canyon Trail.  The Black Canyon Trail Coalition has the official MBAA race point form and is authorized to sign and submit the form on your behalf.  When you attend a work session, just mention to the session coordinator that you want to earn race points.